Proponent
McMaster UniversityProject Lead
Pat Chow-Fraser, Professor Faculty of ScienceProject Dates
2014Project Location
Nottawasaga River
- 15 stations along main branch (between Alliston and Wasaga Beach)
- 4 of 15 sites within the Minesing Wetlands
Project Parameters
- Total phosphorus
- Total nitrogen
- Total nitrate nitrogen
- Total ammonia nitrogen
- Chloride
- Colour
- Total suspended solids
- Total organic suspended solids
- Chlorophyll-a
- pH
- Temperature
- Conductivity
- Turbidity
- Dissolved oxygen
- Soluble reactive phosphorus
- coli
- Periphyton AFDM
Frequency
- Physical and chemical variables measured monthly June-Sept
- coli measured once during July
- Longitudinal survey completed during first week of July
- Continuous monitoring stations June – Oct, measurements recorded every hour